Design and Construction Overview of the Biggest Coal
2021-5-13 · bituminous coal-fired power plant on a full turn-key (FTK) basis to conduct Engineering, Procurement and supply of equipment, and Construction including civil work. 2. Project overview The BLCP power plant is situated in the Map Ta Phut Industrial Estate which is located in Rayong Province in the southeast of Thailand. It takes about two and a
Get Price